Kansikuva näyttelystä Natural Rewards

Natural Rewards

Podcast by Natural Rewards

englanti

Talous & ura

Rajoitettu tarjous

3 kuukautta hintaan 3,99 €

Sitten 7,99 € / kuukausiPeru milloin tahansa.

  • Podimon podcastit
  • Lataa offline-käyttöön
Aloita nyt

Lisää Natural Rewards

Welcome to the Natural Rewards Podcast, your go-to destination for insights into the dynamic world of natural resources companies. Delving into the heart of investment opportunities, we explore listed companies and key themes within the sector. Our content is crafted primarily from an investment perspective, focusing on listed entities. However, we're not afraid to venture into broader topics or generic themes that captivate our audience.

Kaikki jaksot

3 jaksot

jakson Asiamet Resources Management Presentation: BKM Optimisation Update kansikuva

Asiamet Resources Management Presentation: BKM Optimisation Update

Asiamet Resources Management Presentation: BKM Optimisation Update Management presentation led by Chairman Tony Manini and CEO Darryn McClelland, focusing on key updates for the BKM Copper Project’s optimisation programme. Further updates are expected to follow. The main highlights included: 1.⁠ ⁠Material Capex Reductions: •⁠ ⁠Significant Savings and Efficiencies: The optimisation programme for the BKM Copper Project has initially resulted in substantial reductions in capital expenditure (Capex). These savings are expected to significantly strengthen project economics and financing options. •⁠ ⁠Further Potential Capex Reductions: Ongoing assessments are expected to lead to additional Capex reductions, particularly due to the implementation of a staged construction approach. Pre-production Capex savings are expected to range between US$50-80 million, significantly reducing the US$235.4 million estimated in the 2023 Feasibility Study. 2.⁠ ⁠Biomass Power Station: •⁠ ⁠Critical Path Item: The Biomass Power Station is a crucial element of the project, and its development will ensure sustainable energy supply for the BKM project. Management provide further detail on progress including strong interest from Independent Power Producers in delivering the preferred Build, Own, Operate model. Link to original RNS “Material Capex Reductions from BKM Copper Mine Development Engineering” asiametresources.com/wp-content/uploads/2024/08/20240822-ARS-Material-Capex-Reductions-from-BKM-Copper-Mine-Development-Engineering.pdf [https://asiametresources.com/wp-content/uploads/2024/08/20240822-ARS-Material-Capex-Reductions-from-BKM-Copper-Mine-Development-Engineering.pdf] Darryn McClelland, Chief Executive Officer, commented: "Our key focus is on delivering material updates to shareholders, the first of which is a reduction in upfront capex in excess of US$26 million. The resizing of equipment, revisions of suppliers and simplification of the process flowsheet for the staged construction of BKM are key drivers of these savings, and we expect anticipate further updates to detail significant additional capex reductions as we finalise our engineering assessments. It is particularly exciting that these material savings will not only reduce overall funding requirements but also enhance our ability to secure favourable financing terms, which will be a positive development for our shareholders. Solid progress is being made on multiple fronts, including evaluation of a local process limestone source and advancing the Biomass Power Supply project. These developments, combined with the optimisation programme, will enable us to re-engage project lenders with a more highly competitive and financially robust project in hand. The medium to long-term fundamentals of the copper market remain strong and BKM is well-positioned to benefit by delivering copper cathode into a future market characterised by increasing demand and constrained supply. This leverage to rising prices bodes well for longer term financial outcomes. Several workstreams have completed, and others are progressing extremely well. As we report above, we are pleased that our optimisation plans have already demonstrated savings in excess of US$26 million in capex, and we are confident this number will grow. We look forward to building upon this momentum and sharing more capex-related wins with shareholders in the near future."

9. syys 2024 - 22 min
Kuuntele rekisteröitymällä
Loistava design ja vihdoin on helppo löytää podcasteja, joista oikeasti tykkää
Loistava design ja vihdoin on helppo löytää podcasteja, joista oikeasti tykkää
Kiva sovellus podcastien kuunteluun, ja sisältö on monipuolista ja kiinnostavaa
Todella kiva äppi, helppo käyttää ja paljon podcasteja, joita en tiennyt ennestään.

Valitse tilauksesi

Suosituimmat

Rajoitettu tarjous

Premium

  • Podimon podcastit

  • Ei mainoksia Podimon podcasteissa

  • Peru milloin tahansa

3 kuukautta hintaan 3,99 €
Sitten 7,99 € / kuukausi

Aloita nyt

Premium

20 tuntia äänikirjoja

  • Podimon podcastit

  • Ei mainoksia Podimon podcasteissa

  • Peru milloin tahansa

30 vrk ilmainen kokeilu
Sitten 9,99 € / kuukausi

Aloita maksutta

Premium

100 tuntia äänikirjoja

  • Podimon podcastit

  • Ei mainoksia Podimon podcasteissa

  • Peru milloin tahansa

30 vrk ilmainen kokeilu
Sitten 19,99 € / kuukausi

Aloita maksutta

Vain Podimossa

Suosittuja äänikirjoja

Aloita nyt

3 kuukautta hintaan 3,99 €. Sitten 7,99 € / kuukausi. Peru milloin tahansa.