Forsidebilde av showet Natural Rewards

Natural Rewards

Podkast av Natural Rewards

engelsk

Business

Tidsbegrenset tilbud

2 Måneder for 19 kr

Deretter 99 kr / MånedAvslutt når som helst.

  • 20 timer lydbøker i måneden
  • Eksklusive podkaster
  • Gratis podkaster
Kom i gang

Les mer Natural Rewards

Welcome to the Natural Rewards Podcast, your go-to destination for insights into the dynamic world of natural resources companies. Delving into the heart of investment opportunities, we explore listed companies and key themes within the sector. Our content is crafted primarily from an investment perspective, focusing on listed entities. However, we're not afraid to venture into broader topics or generic themes that captivate our audience.

Alle episoder

3 Episoder

episode Asiamet Resources Management Presentation: BKM Optimisation Update cover

Asiamet Resources Management Presentation: BKM Optimisation Update

Asiamet Resources Management Presentation: BKM Optimisation Update Management presentation led by Chairman Tony Manini and CEO Darryn McClelland, focusing on key updates for the BKM Copper Project’s optimisation programme. Further updates are expected to follow. The main highlights included: 1.⁠ ⁠Material Capex Reductions: •⁠ ⁠Significant Savings and Efficiencies: The optimisation programme for the BKM Copper Project has initially resulted in substantial reductions in capital expenditure (Capex). These savings are expected to significantly strengthen project economics and financing options. •⁠ ⁠Further Potential Capex Reductions: Ongoing assessments are expected to lead to additional Capex reductions, particularly due to the implementation of a staged construction approach. Pre-production Capex savings are expected to range between US$50-80 million, significantly reducing the US$235.4 million estimated in the 2023 Feasibility Study. 2.⁠ ⁠Biomass Power Station: •⁠ ⁠Critical Path Item: The Biomass Power Station is a crucial element of the project, and its development will ensure sustainable energy supply for the BKM project. Management provide further detail on progress including strong interest from Independent Power Producers in delivering the preferred Build, Own, Operate model. Link to original RNS “Material Capex Reductions from BKM Copper Mine Development Engineering” asiametresources.com/wp-content/uploads/2024/08/20240822-ARS-Material-Capex-Reductions-from-BKM-Copper-Mine-Development-Engineering.pdf [https://asiametresources.com/wp-content/uploads/2024/08/20240822-ARS-Material-Capex-Reductions-from-BKM-Copper-Mine-Development-Engineering.pdf] Darryn McClelland, Chief Executive Officer, commented: "Our key focus is on delivering material updates to shareholders, the first of which is a reduction in upfront capex in excess of US$26 million. The resizing of equipment, revisions of suppliers and simplification of the process flowsheet for the staged construction of BKM are key drivers of these savings, and we expect anticipate further updates to detail significant additional capex reductions as we finalise our engineering assessments. It is particularly exciting that these material savings will not only reduce overall funding requirements but also enhance our ability to secure favourable financing terms, which will be a positive development for our shareholders. Solid progress is being made on multiple fronts, including evaluation of a local process limestone source and advancing the Biomass Power Supply project. These developments, combined with the optimisation programme, will enable us to re-engage project lenders with a more highly competitive and financially robust project in hand. The medium to long-term fundamentals of the copper market remain strong and BKM is well-positioned to benefit by delivering copper cathode into a future market characterised by increasing demand and constrained supply. This leverage to rising prices bodes well for longer term financial outcomes. Several workstreams have completed, and others are progressing extremely well. As we report above, we are pleased that our optimisation plans have already demonstrated savings in excess of US$26 million in capex, and we are confident this number will grow. We look forward to building upon this momentum and sharing more capex-related wins with shareholders in the near future."

9. sep. 2024 - 22 min
Registrer deg for å lytte
Enkelt å finne frem nye favoritter og lett å navigere seg gjennom innholdet i appen
Enkelt å finne frem nye favoritter og lett å navigere seg gjennom innholdet i appen
Liker at det er både Podcaster (godt utvalg) og lydbøker i samme app, pluss at man kan holde Podcaster og lydbøker atskilt i biblioteket.
Bra app. Oversiktlig og ryddig. MYE bra innhold⭐️⭐️⭐️

Velg abonnementet ditt

Mest populær

Tidsbegrenset tilbud

Premium

20 timer lydbøker

  • Eksklusive podkaster

  • Ingen annonser i Podimo shows

  • Avslutt når som helst

2 Måneder for 19 kr
Deretter 99 kr / Måned

Kom i gang

Premium Plus

100 timer lydbøker

  • Eksklusive podkaster

  • Ingen annonser i Podimo shows

  • Avslutt når som helst

Prøv gratis i 14 dager
Deretter 169 kr / måned

Prøv gratis

Bare på Podimo

Populære lydbøker

Kom i gang

2 Måneder for 19 kr. Deretter 99 kr / Måned. Avslutt når som helst.