Vedeni Energy’s Deep Dive

Regrettable Retention: The Hidden Cost of Keeping the Wrong Employees

20 min · 24. juni 2026
episode Regrettable Retention: The Hidden Cost of Keeping the Wrong Employees cover

Beskrivelse

For years, business leaders have treated retention as an automatic good. Lower turnover has been seen as evidence of a healthy workplace, stable leadership, and strong employee loyalty. In many cases, that remains true. Losing high performers, institutional knowledge, customer relationships, and experienced managers is costly and disruptive. But 2026 has raised a sharper management question: What happens when the people who stay are not the people the organization most needs to retain?

Kommentarer

0

Vær den første til at kommentere

Tilmeld dig nu og bliv en del af Vedeni Energy’s Deep Dive-fællesskabet!

Kom i gang

1 måned kun 9 kr.

Derefter 99 kr. / måned · Opsig når som helst.

  • Podcasts kun på Podimo
  • 20 lydbogstimer pr. måned
  • Gratis podcasts

Alle episoder

100 episoder

episode Flexible Generation in a Low-Carbon Grid cover

Flexible Generation in a Low-Carbon Grid

As the U.S. power system decarbonizes, the reliability challenge is shifting from annual energy sufficiency to dependable performance during scarcity hours, steep ramps, renewable shortfalls, fuel constraints, and extreme weather. This white paper examines the future role of flexible generation in that environment and argues that dispatchable resources will remain necessary, but in a narrower, more strategic, and lower-emission role than in the past. It assesses the operational value and limitations of gas-fired flexibility, hydrogen-capable turbines, advanced peaking resources, and hybrid configurations, and considers how these resources should be coordinated with storage, demand-side flexibility, transmission, and other clean firm options.  Read the full whitepaper here [https://vedeni.energy/wp-content/uploads/2026/06/062326-Flexible-Generation-in-a-Low-Carbon-Grid.pdf]

I går22 min
episode Early-Summer Readiness and Interconnection Pressure cover

Early-Summer Readiness and Interconnection Pressure

Wholesale power markets for the seven-day period ending June 12, 2026, were shaped more by early-summer readiness, interconnection reform, large-load integration, and mounting pressure on transmission buildout than by emergency conditions. ERCOT and PJM produced the week’s most consequential near-term developments: ERCOT continued to manage reliability risks associated with rapidly growing large-load interconnections, while PJM secured federal approval for an expedited interconnection track to bring qualified capacity resources online more quickly. CAISO’s activity focused on daily real-time market reporting, interconnection and deliverability process work, and the continued implementation of EDAM and the Western market.

12. juni 202622 min