Design in Service

Episode 01 - Kitchen Equipment: Is it Cost or Poor Planning?

9 min · 21. elo 2025
jakson Episode 01 - Kitchen Equipment: Is it Cost or Poor Planning? kansikuva

Kuvaus

Design in Service – Kitchen Equipment: Is it Cost or Poor Planning?" hosted by Melissa Yarman In this episode, CKP unpacks one of the most overlooked challenges in construction and facilities design: why service design often fails in real-world execution. Is cost truly the issue—or is poor planning to blame? Whether you're a project manager, designer, or contractor, this conversation offers valuable perspectives that can reshape your approach. Hit play and let’s unpack this together. #PodcastDrop #CKPHospitality #DesigninService #OperationalExcellence#HospitalityInsights #DesignMatters #OperationalTalks #KitchenDesign#ProjectPlanning #ProjectManagement #CostVsPlanning #DesignThinking#ProjectInsights

Kommentit

0

Ole ensimmäinen kommentoija

Rekisteröidy nyt ja liity Design in Service-yhteisöön!

Aloita nyt

3 kuukautta hintaan 7,99 €

Sitten 7,99 € / kuukausi · Peru milloin tahansa.

  • Podimon podcastit
  • 20 kuunteluaikaa / kuukausi
  • Lataa offline-käyttöön

Kaikki jaksot

4 jaksot

jakson Episode 04 - Large Central Food Production Facilities with Ahmed Subactogin kansikuva

Episode 04 - Large Central Food Production Facilities with Ahmed Subactogin

In this episode, we sit down with Ahmed Subactogin to explore his experience in large-scale central food production and the strategic thinking behind some of the region’s most complex facilities. As part of the CKP Hospitality Consultants team, Ahmed brings deep expertise in production-led projects, foodservice planning, and masterplanning—strengthening our multidisciplinary approach to hospitality design. The conversation takes the form of a high-level Q&A, focusing on Ahmed’s work on the Resorts World Genting central food production facilities—completed in 2018 and considered his magnum opus. Project highlights include: • Over 47 million meals produced annually • A 2,000+ m² central production facility • Delivered from design to handover in just 24 months Tune in to gain insights into large-scale food production, operational efficiency, and how facilities of this scale are planned and delivered—at speed. 🎧 Listen now.

11. helmi 20264 min