Scaling Legends

Ames-Kraemer JV Just Won the $1.4B Blatnik Bridge — What the Twin-Ports Design-Build Selection Means for Infrastructure Contractors in 2026

19 min · 1 jul 2026
aflevering Ames-Kraemer JV Just Won the $1.4B Blatnik Bridge — What the Twin-Ports Design-Build Selection Means for Infrastructure Contractors in 2026 artwork

Beschrijving

The Minnesota and Wisconsin Departments of Transportation this week selected Ames-Kraemer Joint Venture II as the apparent best-value proposer for the $1.4 billion design-build replacement of the John A. Blatnik Bridge connecting Duluth, Minnesota and Superior, Wisconsin. Ames-Kraemer's design-build bid was approximately $930 million, with the total project estimated at $1.4 billion. The contract has not yet been formally awarded — the states have up to 60 days to finalize. Separately, Parsons w

Reacties

0

Wees de eerste die een reactie plaatst

Meld je nu aan en word lid van de Scaling Legends community!

Probeer gratis

Probeer 14 dagen gratis

€ 9,99 / maand na proefperiode. · Elk moment opzegbaar.

  • Podcasts die je alleen op Podimo hoort
  • 20 uur luisterboeken / maand
  • Gratis podcasts

Alle afleveringen

237 afleveringen