Vedeni Energy’s Deep Dive

The Grid You Already Own

18 min · 22. mai 2026
episode The Grid You Already Own cover

Beskrivelse

When load growth accelerates, the industry’s reflex is familiar: build the next substation, the next line, the next major capital project. In many cases, that is the right response. But not always. One of the most important questions for utility leaders today is simpler and more consequential: are we using the grid we already have as effectively as possible?

Kommentarer

0

Vær den første til å kommentere

Registrer deg nå og bli medlem av Vedeni Energy’s Deep Dive sitt community!

Prøv gratis

Prøv gratis i 14 dager

99 kr / Måned etter prøveperioden. · Avslutt når som helst.

  • Eksklusive podkaster
  • 20 timer lydbøker i måneden
  • Gratis podkaster

Alle episoder

100 Episoder

episode Managing Delayed Plant Retirements cover

Managing Delayed Plant Retirements

Much of the utility leadership conversation lately has centered on a simple fact: plants once slated for retirement are still operating because Washington ordered them to remain available. That may sound like a legal story, but inside a utility, it is first and foremost a management story. The Department of Energy has continued to use Section 202(c) emergency authority to keep certain coal and gas units available beyond their planned retirement dates. In 2026 alone, DOE orders have covered plants in Pennsylvania, Michigan, Indiana, Washington, Colorado, Maryland, and Puerto Rico. On May 21, DOE issued one order keeping Eddystone Units 3 and 4 available through August 22 and another keeping Wagner Unit 4 available through August 19. Days earlier, DOE also authorized PJM to use backup generation at data centers and other major sites as a last resort before rolling blackouts.

5. juni 202618 min
episode Whitepaper: Grid Reliability in the Era of Extreme Weather cover

Whitepaper: Grid Reliability in the Era of Extreme Weather

The U.S. electric power system has entered a reliability era defined by compound stress. Extreme weather is no longer an occasional external disruption managed through emergency restoration after the fact. Heat waves, winter storms, hurricanes, wildfires, drought, high winds, and flooding now shape core assumptions about resource adequacy, transmission planning, distribution investment, fuel assurance, operating reserves, and emergency procedures. This shift is forcing utilities, ISOs/RTOs, state regulators, FERC, NERC, and reliability coordinators to reconsider long-standing planning practices developed around historical weather patterns, deterministic contingency analysis, and relatively stable load growth. The grid reliability challenge is no longer limited to whether enough nameplate capacity exists on paper.

2. juni 202623 min