GDOT Ahead of the Curve Podcast

Shutting Down to Level Up: The 285 Rebuild Episode

47 min · 2. juni 2026
Billede af episoden Shutting Down to Level Up: The 285 Rebuild Episode

Description

In this episode of Ahead of the Curve, host Natalie Dale breaks down GDOT’s major effort to upgrade and replace key segments of I-285 West in Fulton and Cobb counties. Natalie sits down with Director of Construction Patrick Allen and State Traffic Engineer Sam Harris to discuss the rebuilding process for I-285 and share how motorists can stay informed about upcoming closures.

Comments

0

Be the first to comment

Sign up now and become a member of the GDOT Ahead of the Curve Podcast community!

Get Started

1 month for 9 kr.

Then 99 kr. / month · Cancel anytime

  • Podcasts kun på Podimo
  • 20 lydbogstimer pr. måned
  • Gratis podcasts

All episodes

40 episodes

episode Women in Transportation artwork

Women in Transportation

This special episode of Ahead of the Curve coincides with Women's History Month and is dedicated to the women in transportation. Host Natalie Dale moderates a live panel discussion about the diverse roles and significant contributions of women within the Georgia DOT. The panel consists of the following women who share professional insights about their career journeys at Georgia DOT: Meg Pirkle, Chief Engineer, Angela Whitworth, Treasurer, Merishia Coleman, Executive Assistant to the Chief Engineer, Katina Lear, Assistant Strategic Communications Director, and Natasha Davis, Assistant District 1 Engineer . RESOURCES Celebrating Women in Transportation [https://www.dot.ga.gov/GDOT/Pages/WomeninTransportation.aspx] The Extra Mile Blog: Women Advancing GDOT's Legacy [https://www.dot.ga.gov/GDOT/Pages/ExtraMileBlogDetails.aspx?postID=1295]

7. apr. 202637 min