The Data Center Daily
FERC large-load interconnection reform is the center of gravity: DOE’s push tests who pays for gigawatt-scale AI campuses, while Digital Realty and Equinix’s reported atNorth bids show capital chasing cooler, power-rich Nordic capacity. IN THIS EPISODE 1. Secretary of Energy Directs FERC to Initiate Rulemaking to Expedite Data Center and Large Load Interconnection - Gibson Dunn [https://www.gibsondunn.com/secretary-of-energy-directs-ferc-to-initiate-rulemaking-to-expedite-data-center-and-large-load-interconnection] — Gibson Dunn  Mobile Navigation # Secretary of Energy Directs FERC to Initiate Rulemaking to Expedite Data Center and Large Load Interconnection Client Alert | October 29, 2025 *The Secretary’s Direction included a proposed draft Advanced Notice of Proposed Rulemaking for FERC’s consideration, with a deadline for… 2. Step Back — Everyone keeps talking about FERC speeding up large-load interconnection, but isn’t the real accounting fight around hybrid campuses: when a data center shows up with behind-the-meter gas, batteries, or contracted supply, should the grid study the gross load, the net import, or the failure mode when that supply trips? BACKGROUND SOURCES * Unpacking DOE's proposal to transform data center interconnection | Latitude Media [https://www.latitudemedia.com/news/catalyst-unpacking-does-proposal-to-transform-data-center-interconnection/] — Shayle Kann * Bring Your Own Generation (BYOG): Accelerating the… | PA Consulting [https://www.paconsulting.com/insights/bring-your-own-generation-byog-accelerating-the-path-to-power-supply-solutions] — PA Consulting * Structuring Behind-the-Meter Generation to Manage FERC Jurisdiction - Davis Graham [https://davisgraham.com/news-events/structuring-behind-the-meter-generation-to-manage-ferc-jurisdiction/] — Caroline Schorsch * FirstEnergy asks FERC to require data centers to pay for transmission interconnection costs | Utility Dive [https://www.utilitydive.com/news/firstenergy-ferc-data-center-transmission-interconnection/822333/] — Ethan Howland * The jurisdictional collision over large loads and data center interconnection | Energy Law Report [https://www.energylawreport.com/2026/06/12/the-jurisdictional-collision-over-large-loads-and-data-center-interconnection/] — Sean Aasen * This Week in Hyperscaling: DOE Offers FERC Two Flavors of "Co-Location" [https://elizabethkwhitney.substack.com/p/this-week-in-hyperscaling-doe-offers] — Elizabeth K. Whitney * An outdated FERC policy is undermining the White House’s ratepayer protection pledge | Utility Dive [https://www.utilitydive.com/news/ferc-transmission-policy-white-house-ratepayer-protection-peskoe/815438/] — Ari Peskoe * From Rejection To National Rulemaking: The Federal Regulatory Framework For Data Center Power Is Taking Shape - Renewables - United States [https://www.mondaq.com/unitedstates/renewables/1785802/from-rejection-to-national-rulemaking-the-federal-regulatory-framework-for-data-center-power-is-taking-shape] — RJ Colwell 3. Digital Realty and Equinix battle for atNorth for €4.5 billion - Techzine Global [https://www.techzine.eu/news/infrastructure/136803/digital-realty-and-equinix-battle-for-atnorth-for-e4-5-billion] — Techzine # Digital Realty and Equinix battle for atNorth for €4.5 billion   **Digital Realty and a consortium of Equinix and Canada Pension Plan Investment Board are both… Daily TopFive for The Data Center Daily. Links above go to the original articles. Follow and rate The Data Center Daily on Apple Podcasts [https://podcasts.apple.com/us/podcast/the-data-center-daily/id1896355970] or Spotify [https://open.spotify.com/show/2miCD1T5sntF7t77eRk8xv]. Feedback? Email data-center-daily@lanternpodcasts.com [data-center-daily@lanternpodcasts.com].
32 episodes
Comments
0Be the first to comment
Sign up now and become a member of the The Data Center Daily community!