The Soviet Union: The Rise of a New Empire — Fexingo History
In this episode of The Soviet Union: The Rise of a New Empire, Lucas and Luna explore the construction of the Dnieper Hydroelectric Station, known as DniproHES — one of the most ambitious and symbolically charged projects of the First Five-Year Plan. They discuss how the dam, built between 1927 and 1932 on the Dnieper River near Zaporizhzhia, was not just an engineering feat but a propaganda triumph for Stalin's industrialization drive. The episode covers the American engineer Hugh Cooper, who consulted on the project, the use of forced labor from the Gulag, the massive concrete pour that created the largest dam in Europe at the time, and the human cost: tens of thousands of workers, many of whom died from accidents, disease, or repression. Lucas explains how the dam powered the Dnieper Industrial Combine, including the Zaporizhstal steel plant, and became a symbol of Soviet progress, immortalized in photographs, posters, and film. The conversation also touches on the dam's destruction during World War II, when retreating Soviet forces blew it up in 1941, causing a devastating flood, and its later reconstruction. The episode ends with a reflection on the legacy of such megaprojects — their grandeur and their human toll. #SovietUnion #DnieperDam #DniproHES #Stalin #FiveYearPlan #Industrialization #HughCooper #Zaporizhzhia #Gulag #ForcedLabor #GreatConstruction #SocialistRealism #Hydroelectric #WorldWarII #Ukraine #History #FexingoHistory #Podcast Keep every episode free: buymeacoffee.com/fexingo [https://buymeacoffee.com/fexingo]
177 episodes
Comments
0Be the first to comment
Sign up now and become a member of the The Soviet Union: The Rise of a New Empire — Fexingo History community!