Vedeni Energy’s Deep Dive

Stop Waiting for the Annual Review

20 min · 20 de may de 2026
Portada del episodio Stop Waiting for the Annual Review

Descripción

Performance management should be one of the simplest parts of a manager’s job. Set expectations. Watch the work. Give useful feedback. Correct problems early. Help good people get better. Instead, many companies have turned it into a ceremony. Managers spend days collecting notes, filling out templates, assigning ratings, and preparing for a single formal conversation that tries to do too much at once. Employees walk in expecting judgment, politics, or surprise. Managers often arrive tired and late, hoping to get through the meeting without a fight.

Comentarios

0

Sé la primera persona en comentar

¡Regístrate ahora y únete a la comunidad de Vedeni Energy’s Deep Dive!

Empezar

2 meses por 1 €

Después 4,99 € / mes · Cancela cuando quieras.

  • Podcasts exclusivos
  • 20 horas de audiolibros / mes
  • Podcast gratuitos

Todos los episodios

100 episodios

Portada del episodio Managing Delayed Plant Retirements

Managing Delayed Plant Retirements

Much of the utility leadership conversation lately has centered on a simple fact: plants once slated for retirement are still operating because Washington ordered them to remain available. That may sound like a legal story, but inside a utility, it is first and foremost a management story. The Department of Energy has continued to use Section 202(c) emergency authority to keep certain coal and gas units available beyond their planned retirement dates. In 2026 alone, DOE orders have covered plants in Pennsylvania, Michigan, Indiana, Washington, Colorado, Maryland, and Puerto Rico. On May 21, DOE issued one order keeping Eddystone Units 3 and 4 available through August 22 and another keeping Wagner Unit 4 available through August 19. Days earlier, DOE also authorized PJM to use backup generation at data centers and other major sites as a last resort before rolling blackouts.

5 de jun de 202618 min
Portada del episodio Whitepaper: Grid Reliability in the Era of Extreme Weather

Whitepaper: Grid Reliability in the Era of Extreme Weather

The U.S. electric power system has entered a reliability era defined by compound stress. Extreme weather is no longer an occasional external disruption managed through emergency restoration after the fact. Heat waves, winter storms, hurricanes, wildfires, drought, high winds, and flooding now shape core assumptions about resource adequacy, transmission planning, distribution investment, fuel assurance, operating reserves, and emergency procedures. This shift is forcing utilities, ISOs/RTOs, state regulators, FERC, NERC, and reliability coordinators to reconsider long-standing planning practices developed around historical weather patterns, deterministic contingency analysis, and relatively stable load growth. The grid reliability challenge is no longer limited to whether enough nameplate capacity exists on paper.

2 de jun de 202623 min