Vedeni Energy’s Deep Dive

Flexible Generation in a Low-Carbon Grid

22 min · Gisteren
aflevering Flexible Generation in a Low-Carbon Grid artwork

Beschrijving

As the U.S. power system decarbonizes, the reliability challenge is shifting from annual energy sufficiency to dependable performance during scarcity hours, steep ramps, renewable shortfalls, fuel constraints, and extreme weather. This white paper examines the future role of flexible generation in that environment and argues that dispatchable resources will remain necessary, but in a narrower, more strategic, and lower-emission role than in the past. It assesses the operational value and limitations of gas-fired flexibility, hydrogen-capable turbines, advanced peaking resources, and hybrid configurations, and considers how these resources should be coordinated with storage, demand-side flexibility, transmission, and other clean firm options.  Read the full whitepaper here [https://vedeni.energy/wp-content/uploads/2026/06/062326-Flexible-Generation-in-a-Low-Carbon-Grid.pdf]

Reacties

0

Wees de eerste die een reactie plaatst

Meld je nu aan en word lid van de Vedeni Energy’s Deep Dive community!

Probeer gratis

Probeer 14 dagen gratis

€ 9,99 / maand na proefperiode. · Elk moment opzegbaar.

  • Podcasts die je alleen op Podimo hoort
  • 20 uur luisterboeken / maand
  • Gratis podcasts

Alle afleveringen

100 afleveringen

aflevering Flexible Generation in a Low-Carbon Grid artwork

Flexible Generation in a Low-Carbon Grid

As the U.S. power system decarbonizes, the reliability challenge is shifting from annual energy sufficiency to dependable performance during scarcity hours, steep ramps, renewable shortfalls, fuel constraints, and extreme weather. This white paper examines the future role of flexible generation in that environment and argues that dispatchable resources will remain necessary, but in a narrower, more strategic, and lower-emission role than in the past. It assesses the operational value and limitations of gas-fired flexibility, hydrogen-capable turbines, advanced peaking resources, and hybrid configurations, and considers how these resources should be coordinated with storage, demand-side flexibility, transmission, and other clean firm options.  Read the full whitepaper here [https://vedeni.energy/wp-content/uploads/2026/06/062326-Flexible-Generation-in-a-Low-Carbon-Grid.pdf]

Gisteren22 min
aflevering Early-Summer Readiness and Interconnection Pressure artwork

Early-Summer Readiness and Interconnection Pressure

Wholesale power markets for the seven-day period ending June 12, 2026, were shaped more by early-summer readiness, interconnection reform, large-load integration, and mounting pressure on transmission buildout than by emergency conditions. ERCOT and PJM produced the week’s most consequential near-term developments: ERCOT continued to manage reliability risks associated with rapidly growing large-load interconnections, while PJM secured federal approval for an expedited interconnection track to bring qualified capacity resources online more quickly. CAISO’s activity focused on daily real-time market reporting, interconnection and deliverability process work, and the continued implementation of EDAM and the Western market.

12 jun 202622 min