Authentic Encore

Test Pilot Episode 3: Developmental Test

1 h 40 min · 28. aug. 2024
episode Test Pilot Episode 3: Developmental Test cover

Beskrivelse

Episode 3 of the Test Pilot Series has Sunshine interviewing Dan “TOFU” Price, LCDR, USN (ret). These two patch wearers discuss Weapon Developmental Test and Evaluation. DT&E is the test and evaluation conducted to demonstrate that the engineering, design and development process is complete, demonstrate that the design risks have been minimized and that the system will meet specifications. In essence, a concept has been turned into reality, but before that new weapons system goes to the fleet and even before it goes to Operational Test, it must prove itself in Developmental Test. The rigorous testing imposed on these new systems ensure that the investment made by the military (and your tax dollars) in the weapons system will perform as intended.

Kommentarer

0

Vær den første til å kommentere

Registrer deg nå og bli medlem av Authentic Encore sitt community!

Kom i gang

2 Måneder for 19 kr

Deretter 99 kr / Måned · Avslutt når som helst.

  • Eksklusive podkaster
  • 20 timer lydbøker i måneden
  • Gratis podkaster

Alle episoder

20 Episoder

episode Test Pilot Episode 3: Developmental Test cover

Test Pilot Episode 3: Developmental Test

Episode 3 of the Test Pilot Series has Sunshine interviewing Dan “TOFU” Price, LCDR, USN (ret). These two patch wearers discuss Weapon Developmental Test and Evaluation. DT&E is the test and evaluation conducted to demonstrate that the engineering, design and development process is complete, demonstrate that the design risks have been minimized and that the system will meet specifications. In essence, a concept has been turned into reality, but before that new weapons system goes to the fleet and even before it goes to Operational Test, it must prove itself in Developmental Test. The rigorous testing imposed on these new systems ensure that the investment made by the military (and your tax dollars) in the weapons system will perform as intended.

28. aug. 20241 h 40 min