The BERcast

The BERcast | Season 2 Episode 9 | Preparing for the 2024 IECC (& Previewing 2027)

1 h 9 min · 27. aug. 2025
episode The BERcast | Season 2 Episode 9 | Preparing for the 2024 IECC (& Previewing 2027) cover

Beskrivelse

In the latest episode of The BERcast, BER's Chris McTaggart is joined by Gayathri Vijayakumar (Steven Winter Associates), Richard Truitt (Department of Inspections, Harford County, MD), and Jerica Stacey (International Code Council) to break down the key updates you need to know for the 2024 IECC—plus an insider preview of what could be on the horizon for the 2027 IECC.

Kommentarer

0

Vær den første til å kommentere

Registrer deg nå og bli medlem av The BERcast sitt community!

Kom i gang

2 Måneder for 19 kr

Deretter 99 kr / Måned · Avslutt når som helst.

  • Eksklusive podkaster
  • 20 timer lydbøker i måneden
  • Gratis podkaster

Alle episoder

25 Episoder

episode The BERcast | Season 2 Episode 12 | The 2025 NYSECCC and the Delay on Electrification cover

The BERcast | Season 2 Episode 12 | The 2025 NYSECCC and the Delay on Electrification

In the Season 2 finale of The BERcast, Chris McTaggart is joined by special guests Michael Caruso and Anthony LoCascio to discuss the delay of NY State’s ban on installing fossil-fuel equipment in new residential buildings under seven stories, explore what a future all-electric code could look like, and examine the concerns, readiness, and pushback from builders, architects, contractors and other industry professionals—especially amid rising electricity costs. Energy Testing Services has released a helpful guide outlining the code's key updates to insulation and building envelope requirements, heating and cooling systems, energy modeling, and testing: https://www.energytestingservices.com/2025/09/08/new-york-state-energy-code-change-2025-eccc-of-nys/

11. des. 20251 h 1 min