Design in Service

Episode 01 - Kitchen Equipment: Is it Cost or Poor Planning?

9 min · 21. Aug. 2025
Episode Episode 01 - Kitchen Equipment: Is it Cost or Poor Planning? Cover

Beschreibung

Design in Service – Kitchen Equipment: Is it Cost or Poor Planning?" hosted by Melissa Yarman In this episode, CKP unpacks one of the most overlooked challenges in construction and facilities design: why service design often fails in real-world execution. Is cost truly the issue—or is poor planning to blame? Whether you're a project manager, designer, or contractor, this conversation offers valuable perspectives that can reshape your approach. Hit play and let’s unpack this together. #PodcastDrop #CKPHospitality #DesigninService #OperationalExcellence#HospitalityInsights #DesignMatters #OperationalTalks #KitchenDesign#ProjectPlanning #ProjectManagement #CostVsPlanning #DesignThinking#ProjectInsights

Kommentare

0

Sei die erste Person, die kommentiert

Melde dich jetzt an und werde Teil der Design in Service-Community!

Loslegen

2 Monate für 1 €

Dann 4,99 € / Monat · Jederzeit kündbar.

  • Podcasts nur bei Podimo
  • 20 Stunden Hörbücher / Monat
  • Alle kostenlosen Podcasts

Alle Folgen

4 Folgen

Episode Episode 04 - Large Central Food Production Facilities with Ahmed Subactogin Cover

Episode 04 - Large Central Food Production Facilities with Ahmed Subactogin

In this episode, we sit down with Ahmed Subactogin to explore his experience in large-scale central food production and the strategic thinking behind some of the region’s most complex facilities. As part of the CKP Hospitality Consultants team, Ahmed brings deep expertise in production-led projects, foodservice planning, and masterplanning—strengthening our multidisciplinary approach to hospitality design. The conversation takes the form of a high-level Q&A, focusing on Ahmed’s work on the Resorts World Genting central food production facilities—completed in 2018 and considered his magnum opus. Project highlights include: • Over 47 million meals produced annually • A 2,000+ m² central production facility • Delivered from design to handover in just 24 months Tune in to gain insights into large-scale food production, operational efficiency, and how facilities of this scale are planned and delivered—at speed. 🎧 Listen now.

11. Feb. 20264 min